GSI Outdoors PNEG-1521 Satellite TV System User Manual


 
INSTALLATION
28 PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger
E. Place the Bearing Stand Assembly onto the
Connecting Shaft.
11. INSTALLING THE SWEEP FLIGHTING
(Cont.)
C. Fasten the first section of Sweep Flight to the
U-Joint Flight Shaft with two (2) 5/8" x 4" Grade 8
bolts and Stover nuts. Make sure that the
Dura-Edge side of the Sweep Flight faces the
center of the Bin.
D. Next, bolt the 2" OD x 11-½” Connecting Shaft to
the Sweep Flight with two (2) 5/8" x 4" Grade 8
bolts and Stover nuts.
U-Joint
Flight Shaft
5/8” Stover Nuts
5/8” x 4” Grade 8 Bolts
Sweep
Flight
Assembled
Sweep Flight
5/8” x 4” Hex Bolt
5/8” Stover Nut
Connecting
Shaft
Bearing Stand Assembly
Connecting Shaft
FIG. 11-C
FIG. 11-D
FIG. 11-E