Black Box QCE42U Cable Box User Manual


 
STEP 7. Install the (4) infill panels (Item K) parallel to the
mounting angles. Attach the depth support rails using M6
pozi pan screws (Item F).
724 -746 -5500 | blackbox.com
STEP 8. Install the gasket foam (Item L and Item M) to the
complete sides, front, and rear of cabinet.
NOTE: Make sure that the gasket isn’t stretched. Using your
thumbs, install the gasket into place. Remember that
the 0.6” (15-mm) gasket is for the sides and the 0.4”
(10-mm) gasket is for the front and rear.
STEP 9. Install the anti-recirculation kit (Item N) into the side
and front fascias. Make sure there are no gaps.
STEP 10. Install the side panels (Item O) into the location pins
on the base. Fit the front and rear doors (Item R and Item S)
onto the hinges.
Page 3