5 of 10
ISSUED: 01-05-10 SHEET #: 125-9128-1 06-28-10
E
Installation to Wall Stud
Useastudndertolocatetheedgesofthestud.Useofanedge-to-edgestudnderishighlyrecommended.
Basedontheiredges,drawaverticallinedownthestudcenter.Placewallplate(B)onwallasatemplate.Level
plate, and mark the center of the four mounting holes. Make sure that the mounting holes are on the stud center
line.Drillfour5/32"(4mm)dia.holes2-1/2"(65mm)deep.Makesurethatthewallplate(B)islevel,secureit
usingfour#14x2.5"woodscrews(E)asshownbelow.
• Installermustverifythatthesupportingsurfacewillsafelysupportthecombinedloadoftheequipmentandall
attached hardware and components.
• Tightenwoodscrewssothatwallplateisrmlyattached,butdonotovertighten.Overtighteningcandamagethe
screws, greatly reducing their holding power.
• Nevertighteninexcessof80in.•lb(9N.M.).
• Makesurethatmountingscrewsareanchoredintothecenterofthestud.Theuseofan"edgetoedge"studnder
is highly recommended.
• Hardwareprovidedisforattachmentofmountthroughstandardthicknessdrywallorplasterintowoodstuds.
Installers are responsible to provide hardware for other types of mounting situations.
WARNING
1
B
STUD