ZyXEL Communications nsa320 Home Theater Server User Manual


 
Chapter 18 Maintenance Screens
Media Server User’s Guide
329
18.4 The Log Screen
Click Maintenance > Log to open the following screen.
Execute Time
(hh:mm)
Enter the time, day, and/or day of the month as appropriate for this power control
schedule entry. Leave more than 10 minutes between the execution times of the entries.
If the NSA turns off or restarts while a user is transferring files to or from the NSA, the
transfer fails. The user will need to restart the transfer.
The NSA skips a scheduled restart or power off if the execution time comes while the NSA
is doing any of the following:
Resynchronizing a RAID
Upgrading firmware
Replacing the configuration file
If the NSA is turned off at the time when a restart or power off is scheduled, the NSA does
not perform the restart or power off.
If the NSA is turned on at the time when a power on is scheduled, the NSA does not
perform the power on.
Use this part of the screen to configure power on, power off, and reboot times.
Please select the
day of the month
This is only available if you set the Frequency to Monthly.
Choose the day of each month for the power control schedule entry.
Every how many
weeks?
This is only available if you set the Frequency to Weekly.
Enter the interval between weeks and choose the day of the week for the power control
schedule entry.
Every how many
days?
This is only available if you set the Frequency to Daily.
Enter the interval between days for the power control schedule entry.
Add Click this to add the power control schedule to the list.
Apply Click this to save your changes.
Cancel Click this to return to the previous screen without saving.
Table 115 Maintenance > Power Management > Edit (continued)
LABEL DESCRIPTION