UGR004/1200 Moducon Belt Conveyor
INSTALLATION 3-3
PREPARING FOR
INSTALLATION
Plan the location. Make sure the area where the belt conveyor
is installed has the following:
● A grounded power source. The belt conveyor
requires single phase, 100-115V, 50/60 Hz. All wiring
should be completed by qualified electrical technicians
and should comply with your region’s electrical codes.
● Clearance for safe operation and maintenance.
Make sure there is enough clearance around the con-
veyor for safe operation, maintenance and servicing.
We recommend maintaining at least 24 inches
(510mm) around all sides of the conveyor.
Perform the installation in the following order:
❒ Move the conveyor into position and adjust the level-
ing devices on the legs (or lock the optional casters).
❒ Adjust the height of the legs so that the conveyor belt
is at the proper height for your needs.
❒ Connect the conveyor to the power source.
❒ Adjust the belt speed.
24 inches
(610 mm)
24 inches
(610 mm)
24 inches
(610 mm)
24 inches
(610 mm)