A SERVICE OF

logo

5. Install the CS temporarily for the site survey. Install the CS at least 2 m above the floor, and place the
antennas so that
they are pointing in directions that are 90 degrees apart (for antenna diversity), as follows:
At least 2 m
45º
45º
90º
Installation Manual 223
2.10.4 Before Site Survey