250 Z & Javelin Series
1/2006 5
TP 300-5148-00-HZ-SN
Quick Setup List -
Page Setup Procedure Steps to Perform
6 Uncrating ❏ Remove crate & banding.
❏ Place transmissions in ROLL RELEASE position & roll off
skid.
7 Battery Activation & ❏ Charge the battery
(Note: proceed with other setup steps
Installation
while battery is charging).
❏ Install & secure battery.
8 Check Fluid Levels ❏ Fill & check Engine oil level.
❏ Reduce & check tire pressures
(Front tires 25 psi, rear tires 15 psi).
9 Mower Assembly ❏ Torque mower blade hardware.
9 Lubrication ❏ Lubricate all grease & oil points.
10 SAFETY CHECKS ❏ Check for LOOSE HARDWARE.
❏ Check all OPERA
T
OR CONTROLS.
❏ Perform MO
WER BLADE STOPPING CHECK.
(Blade must stop within 5 seconds!)
❏ Perform SAFETY INTERLOCK SYSTEM CHECK
.
10 Burnish Electric Clutch ❏ Burnish electric clutch
(run for 15 seconds, repeat 10 times)
.
❏ Repeat MO
WER BLADE STOPPING CHECK.
(Blade must stop within 5 seconds!)