4. Putting into op er a tion
ยป
This chap ter is in tended for op er at ing per son nel.
Pre req ui site for this chap ter is gen eral knowl edge of the op -
er a tion of con vey ing sys tems.
Also pre req ui site for this chap ter is that the func tion ing de -
scrip tion has been read and un der stood.
En sure in each case that the op er at ing per son nel are suf fi -
ciently in formed.
F
Check the com pressed-air sup ply (max. 5-6 bar (72-87 PSI)
sys tem overpressure).
Check the con nec tions of the lines (con vey ing lines and vac -
uum lines).
Check to make sure the col lect ing con tainer is cor rectly in -
serted.
Check the elec tri cal con nec tion.
&
The safety fil ter can only be used to gether with a con vey ing
sys tem.
a536-3MS
SFC-A
Putting into op er a tion 23