Pentair CP30 Universal Remote User Manual


 
SYSTEM OPTIONS
RECOMMENDED HYDRAULIC SCHEMATIC
POOL CLEANER
:
For systems which incorporate a booster pump pool cleaner, it is possible to add a
mechanical time clock for programming the daily cleaning cycles.
Install 24-Hour Time Clock (model TMR-LX) into LX-30 faceplate at the
CLEANER TIMER location, and plug into circuit board at CLNR TIMER socket, in
accordance with instructions provided.
Install a Relay Kit (model RLY-LX) at the LX-30 Power Center in accordance
with instructions provided, and plug into circuit board at CLNR relay socket.
NOTE
:
It will not be possible to activate the pool cleaner unless the CP-30
Remote Control has been connected.
SPA WATERFALL CONTROL
:
For systems where spa water level is higher than that of the pool, it is possible to
use either
AUXl or AUX2 Switches at the Remote Control to rotate the return
valve to spa return position.
This creates an overflow (waterfall effect) from the spa into the pool, while the
system is in "pool mode". The effect will, however, cease whenever the system is
in "spa mode".
To enable this feature, install a Spa Waterfall Control (model RLY-WTRFL) at
the LX-30 Power Center in accordance with instructions provided.
FREEZE PROTECTION
:
A Recirculating Freeze Sensor (model FPS-C) may be added to the system. It
will protect the plumbing and equipment from possible freeze damage by running
the filter pump whenever the temperature falls to approx. 41°F.
Install FPS-C in accordance with instructions provided, and connect to circuit
board at FRZ and GND screw terminals, in accordance with wiring diagram.
An Auxiliary Freeze Sensor (model FPS-AUX) may also be added to activate
auxiliary equipment (such as a jet pump) during potential freezing conditions.
Install FPS-AUX in accordance with instructions provided.
NOTE
:
It is advisable to inspect and test the freeze sensor(s) at least once
a year, preferably prior to the onset of the freezing season. Testing can be
accomplished by immersing sensor in ice water.
Refer to Page
2
for Plumbing Requirements