A SERVICE OF

logo

Installing the VoIP Intercom
Intercom Setup
Operations Guide 930181B CyberData Corporation
11
2.2.5 Network Connectivity, and Data Rate
When you plug in the Ethernet cable or power supply:
The square, green Link light above the Ethernet port indicates that the network connection has
been established (see Figure 2-9 and Figure 2-10). The Link light changes color to confirm the
auto-negotiated baud rate:
This light is yellow at 10 Mbps.
It is orange at 100 Mbps.
Figure 2-9. Network Connector Prior to Installation
Link
Activity
Ethernet