Peerless Industries PP740-S Flat Panel Television User Manual


 
5 of 46
ISSUED: 01-15-08 SHEET #: 095-9282-2 06-12-09
Installation to Wood Stud Wall
Using a stud nder, locate and mark the edges of the wood stud used in mounting this product. Use of an edge to
edge stud nder is highly recommended. Use a level to draw a vertical line down the center of the stud. Use wall
plate as template to mark center of holes along the vertical line. Drill two 5/32" (4 mm) dia. holes 2.5" (64 mm)
deep. Attach wall mount (A) to wall using two #14 x 2.5" at head wood screws (H) as shown.
Skip to step 3 on page 7.
2
• Installer must verify that the supporting surface will safely support the combined load of the equipment and all
attached hardware and components.
• Tighten wood screws so that wall plate is rmly attached, but do not overtighten. Overtightening can damage the
screws, greatly reducing their holding power.
• Never tighten in excess of 80 in. • lb (9 N.M.).
• Make sure that mounting screws are anchored into the center of the stud. The use of an "edge to edge" stud nder
is highly recommended.
• Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs. Install-
ers are responsible to provide hardware for other types of mounting situations (not UL approved).
WARNING
A
H
WOOD STUD WALL
WALL PLATE