3.0 INSTALLATION
To install the Pelco Infrared VCR Controller, proceed as follows:
1. Set the baud.
2. Set the start address.
3. Connect the CM9760-IRC to the CM9760-CC1 host.
4. Connect additional IRC units in daisy-chain fashion.
5. Connect VCRs to the Video Matrix Bay (CM9760-MXB).
6. Connect the IR control cables to the VCRs.
Each step listed above is detailed below:
3.1 COMMUNICATION CARD
The communication card (refer to Figure 4) has a bank of eight DIP switches used to
do the following:
1. Set the operating baud of the unit
2. Set the start address
In Figure 5, DIP switch number 2 is ON.
Figure 4. Communication Card
Figure 5. DIP Switches