ENGLISH
Required Hardware for Step 1
(2) M12 x 40
(2) M8 x 35
(2) M6 x 20
(2) M12 Washer
(2) M8 Washer
Required Hardware for Step 2
(2) M8 Allen Bolt
(2) Spring Washer
(2) M8 Washer
Step 1:
Attach the Pillar (d) to the Base (a) by placing each M12 x 40 Bolt (m) through an M12 Washer (n), each M8 x 35 Bolt
through an M8 Washer (s). Then thread each Bolt up through the Base and into the Pillar as shown in Diagram 1a. The M12
x 40 Bolts should be threaded into the front two holes of the Pillar, while the M8 x 35 Bolts should be threaded into the back
two holes of the Pillar. Tighten the M12 x 40 Bolts with a wrench, and tighten the M8 x 35 Bolts with a Phillips screw driver.
Proceed to insert two M6 x 20 Bolts (p) into the holes on the back of the Pillar as seen in Diagram 1b. Tighten the M6 x 20
Bolts with a Phillips screw driver.
Detailed View A Detailed View B
p
d d
n
s
m a a
o
Diagram 1a Diagram 1b
Step 2:
Thread an M8 Allen Bolt (q) through a Spring Washer (r), an M8 Washer (s), the Shelf Bracket (g), and into the Shelf Plate
(e). See Diagram 2 for the proper assembly of these parts. Loosely tighten the M8 Allen Bolt into the Shelf Plate with an
Allen Key (ll). Leave approximately a 1/8” gap between the Shelf Bracket and the Shelf Plate for Step 4.
Diagram 2
e
s
r g
q