1-1
CHAPTER
1
Physical Specification
This chapter describes what the reader is expected to know, including physical
specification for the SPARC
®
Enterprise M8000/M9000 servers, before planning
server installation.
This chapter contains the following sections:
■ Section 1.1, “Before Setting Up the System” on page 1-1
■ Section 1.2, “Physical Specifications” on page 1-4
1.1 Before Setting Up the System
Before starting server installation, verify that the requirements listed in TABLE 1-1 are
satisfied.
TABLE 1-1 Checklist (1 of 3)
Requirements Item Check
System components Have the server components been decided?
❏
Has the total number of servers been decided?
❏
System management Have the system administrators and operators taken the required Sun
Microsystems or Fujitsu training courses?
❏