
20
ENG
ENGLISH
ASSEMBLINGANDPREPARING
Tidyingcables
Only 32/37/42/47LV37
**
1 Gather and bind the cables with the Cable
Holderon the TV back cover.
Only
50/60PZ57
**
,
50/60PZ75
**
, 50/60PZ95
**
1 Install the PowerCordHolder and Power
Cord. It will help prevent the power cable from
being removed by accident.
2 Gather and bind the cables with the Cable
Holder. Install the LAN cable as shown to
reduce the electromagnetic wave.
Do not move the TV by holding the Cable
Holder & PowerCordHolder, as the
Cable holders may break, and injuries
and damage to the TV may occur.
CAUTION
CableHolder
Disconnect the power first, and then move or
install the TV. Otherwise electric shock may
occur.
If you install the TV on a ceiling or slanted
wall, it may fall and result in severe injury.
Use an authorized LG wall mount bracket
and contact the local dealer or qualified
personnel.
Do not over tighten the screws as this may
cause damage to the TV and void your war-
ranty.
Use the screws and wall mount bracket that
meet the VESA standard. Any damages or
injuries by misuse or using an improper ac-
cessory are not covered by the warranty.
CAUTION
Use the screws that are listed on the VESA
standard screw specifications.
The wall mount kit includes an installation
manual and necessary parts.
The length of screws may differ depending
on the wall mount. Make sure to use the
proper length.
For more information, refer to the manual
supplied with the wall mount bracket.
NOTE
Model 50PZ57
**
50PZ75
**
50PZ95
**
60PZ57
**
60PZ75
**
60PZ95
**
VESA(AxB) 400 x 400 600 x 400
Standardscrew M6 M8
Numberofscrews 4 4
Wallmount
bracket
PSW400B,
PSW400BG,
DSW400BG
PSW600B,
PSW600BG
PowerCordHolder
Downloaded From TV-Manual.com Manuals