Emerson HAS8xE-IM-ATEX TV Converter Box User Manual


 
MLT 2 / BINOS
100 F
Emerson Process Management Manufacturing GmbH & Co. OHG
2 - 1
ATEX Instruction Manual
HAS8xE-IM-ATEX
January 2004
SECTION 2
Installation
Before starting to install this equipment, read the corresponding sections of the
analyzer’s instruction manual and the manuals of the additional equipment!
Failure to follow the safety instructions could result in serious injury or death.
2-1 General
Proper functioning of the Emerson Process
Management gas analyzers depends on
proper installation. All procedures in this
section, in the corresponding sections of the
analyzer instruction manual and the manuals
of the attached safety devices must be
followed carefully.
2-2 Installation of the Unit
Install the assembled unit as described in
the analyzer’s instruction manual: Refer to
the dimensional drawings in this manual
(fig. 2-1a/b and 2-2a/b) to ensure the
designated location is dimensioned
sufficiently.
The weight of an assembled unit may be up
to approx. 40 kg incl. pressurization system.
Take care to use anchors and
bolts specified to be used for
the weight of the units!
Take care the wall the unit is
intended to be installed at is
solid and stable to hold the
units!