Emerson HAS8xE-IM-ATEX TV Converter Box User Manual


 
MLT 2 / BINOS
100 F
Emerson Process Management Manufacturing GmbH & Co. OHG
3 - 1
ATEX Instruction Manual
HAS8xE-IM-ATEX
January 2004
SECTION 3
Startup
Startup can only be done properly by personnel being familiar with the contents
of all applicable manuals and related instructions!
Especially the warnings provided by the documentation have to be observed!
3-1 Final Check
Make sure that the analyzer and the related
pressurization system have been setup as
described in section 2 and all covers and
doors are closed and fixed.
All unused cable glands need to be sealed
using the supplied approved sealing plug
(part no. ETC00791; fig. 3-1)
Unused cable gland openings in the
enclosure need to be covered using a
special screw (part no. ETC 000790; fig. 3-2).
Fig. 3-1
Cable gland sealing plug
Fig. 3-2
Cable gland hexagon socket screw sealing plug
3-2 Switching On
In a next step the analyzer may be powered
by opening the purge gas supply and
switching on the power supply.
Use only the components listed
above as these are ATEX
approved for use in hazardous
areas!