iOptron ZEQ25GT TV Mount User Manual


 
13
(1) Remove CW Shaft Locking Screw from the CW Mounting Nose.
(2) Insert CW shaft into the CW Mounting Nose as indicated in 2nd photo below.
(3) Lock it using CW Shaft Locking Screw from the other side of the CW Mounting Nose. Tighten the
Front CW Positioning Screw which is located in front of the CW Mounting Nose.
If the latitude of the observation location is lower than 10º, thread in the Rear CW Position Screw (a
hex head set screw) before tightening the Front CW Positioning Screw to avoid CW hit tripod legs. Then
tighten the Front CW Positioning Screw.
Rear CW Position Screw
Figure 11. Tilt counterweight shaft for low altitude
CW Safety Screw
CW Bar
Counterweight
CW Locking Screw
Figure 12. Install counterweight
STEP 6. Install Counterweight
Remove CW Safety Cap at the end of CW Shaft. With the wider opening towards the shaft end,
guide CW through the shaft. Use the CW Locking Screw to hold the CW in place. Place Safety Cap back
onto the shaft. ZEQ25 comes with a 10.4 lbs (4.7kg) counterweight. It should be able to balance a total
payload of about 13 lbs (6kg) for a 6” diameter telescope. An optional CW or extension bar is needed for a
heavier payload or a larger diameter Telescope.
STEP 7 Attach and Balance an OTA on the Mount Connect Cables
After attaching an OTA and accessories to the mount, the ZEQ25 mount must be balanced in both
R.A. and DEC axes to ensure minimum stress on the mount (such as gears and motors inside).
CAUTION: The telescope may swing freely when the R.A. or DEC Gear Switch is released. Always
hold on to the OTA before you release the gear switch to prevent it from swinging. It can cause
personal injury or damage to the equipment.
Release Tension Adjuster by turning it counterclockwise. Turn Gear Switch knob 90 degree to
OPEN position to disengage the worm from the worm wheel.
Tension Adjusters
OPENLOCK
Gear Switch
Figure 13. Gear Switch operation