KVH Industries TracVision L2 Satellite TV System User Manual


 
3. Open the terminal emulation software and
establish the following settings:
•9600 baud
no parity
•8 data bits
•1 start bit
•1 stop bit
no flow control
4. Apply power to the TracVision L2 system and
allow the system to complete full initialization.
Data should be scrolling on the PC display to
identify any system problems detected. If no data
is seen, recheck your connections and the terminal
software setup.
4.5 Maintenance Port Parser
Commands
TracVision L2 system parser commands are detailed in
Appendix F.
4-7
Troubleshooting
54-0195 Rev. A