Commissioning
14
Commissioning
Switching-Up
• Connect the instrument to the mains with the wall power supply.
• Turn the on/off switch to the right.
• Adjust the desired volume.
The LC display will then indicate the particular software version for appr.
1 second.
Thereafter the LC display will indicate the loading capacity of the battery
for appr. 3 seconds.
One segment comes up to appr. 20% of the overall capacity (3.4 Ah).
Now, feed in the reception signal of the receiving installation in the RF
input socket.
LC display:
• channel
• mode
• level (A = analogue level measurement; D = digital level
measurement)
Select the desired mode by pressing [TV/SAT]
Switching-Off
Turn the on/off switch counter-clockwise.
Software V2.0
SN: 000222
ACCU [−−−−−]
CH: .02. TV
LEV: 48.5dBuV A