A SERVICE OF

logo

15
INSTALLATION OF CEMENT PAD
Lay out the cement pad as shown. Be sure top surface is level. Allow 2
days cure time before installing operator. Bolt pattern must be parallel to
the gate.
4-1/2"
3-3/4"
Ref
Fence
2-1/2"
Ref
3"
A
Gate
Opening
Gate
B
36" Min.
Min. Side Room Required = Gate Opening +A +B +36"
C
L
Of Drive Chain
Gate
Bracket
2
1
1/2" Mounting Hardware (6) Places ( Not Supplied).
28" X 25-1/2"
Cement Pad
2 Install Chain Support Bracket As Required.
1
28"
(Ref)
20-1/2"
Ref
Electrial
Conduit
8"
10-3/4"
10-3/4"
1"