1
®
3
W-85 WALL CONTROL PREPARATION
WALL CONTROL AND HARDWARE (not to scale)
Switch Mounting
Screws (2)
Wall Plate Screws
(2) White
(2) Almond
White Wall
Plate(1)
Figure #3
W-85
Wall Control
Prepare for W-85 Wall Control Bezel replacement
as follows:
Before installing the W-85 wall control you will need to
check and see if you will need to change the bezel on
the front of the wall control from WHITE to ALMOND.
If you are going to use white, skip these steps and go
to wall control installation starting on page 3. If you are
going to use the ALMOND bezel and wall plate you
will rst need to change the bezel on the front of the
switch before installing the switch in to the wall.
Step 16a. Locate the four (4) tabs holding the bezel to
the front of the switch, then press in on each tab one at
a time, removing the bezel as shown in Figure #1.
Step 16b. Locate the rubber key pad attached to
the four (4) locating pins as shown in Figure #2 and
remove rubber key pad from the WHITE bezel, also
as shown in Figure #2.
Step 16c. Reinstall the rubber key pad on to the
four (4) locating pins located on the almond bezel as
shown in Figure #3.
Switch Bezels
(1) White
(1) Almond
Figure #1
Figure #2
Almond Wall
Plate(1)
BEZEL
BEZEL
TABS
WHITE
BEZEL
ALMOND
BEZEL
RUBBER KEY
PAD
RUBBER KEY
PAD
LOCATING
PINS (4)
LOCATING
PINS
HOLES(4)
W-85 WALL CONTROL INSTALLATION
(4) Wire Cap