Fujitsu M8000 Home Theater Server User Manual


 
1-30 SPARC Enterprise M8000/M9000 Servers Site Planning Guide September 2007
1.2.3 Planning Your Access Route
This section describes necessary considerations before you move the server to its
installation destination.
1.2.3.1 Space Required for System Transport
The access route must satisfy the requirements listed in TABLE 1-4.
Each cabinet is packed with simple packaging or in a wood-framed case for shipping
of the server. If it is difficult to carry the packed cabinet to the installation
destination, remove the packing materials, front and rear doors, side panels, and/or
other parts as necessary.
If the cabinet weight exceeds the minimum withstand load for the transport
equipment used, you can move the cabinet with its PSU and FAN (about 4 kg each)
removed.
TABLE 1-4 Space Required for Transport (1 of 2)
Name
Device
status
during
transport
1
Minimum
door height
[mm (inch)]
Minimum
door width
[mm (inch)]
Minimum
passage
width [mm
(inch)]
Minimum
elevator car
depth [mm
(inch)]
Minimum
withstand
load of
transport
equipment
[kg]
3
Maximum
inclination
of access
route [˚ ]
SPARC
Enterprise
M8000 Server
Simple
packaging
1
1900 (74.8) 1000 (39.4) 1200 (47.2) 1500 (59.0) 820 10
Without
front and
rear doors
or side
panels
1900 (74.8) 800 (31.5) 1000 (39.4) 1350 (53.1) 690 10
Tri-Wall
2
2100 (82.7) 1800 (70.9) 1800 (70.9) 1100 (43.3) 830 10
Wooden
2
packing
2100 (82.7) 1900 (74.8) 1900 (74.8) 1100 (43.3) 980 10