Fujitsu M8000 Home Theater Server User Manual


 
2-20 SPARC Enterprise M8000/M9000 Servers Site Planning Guide September 2007
Power Cable Connection Specifications
Part of the local electrical work for three-phase power feed is connecting the power
cable from the power distribution board directly to the Power Cabinet terminal
board.
Make sure that the facility administrator or a qualified electrical engineer performs
the electrical work.
FIGURE 2-9 Three-Phase Star Power Supply Connections
Power Cabinet
FG
( Mark)
Cover
M8000: AWG10
M9000: AWG8
Remove the
cover
ACS for dual power feed
ACS for base power feed
Compression terminal (x10)
Power cable
Bolt diameter: M6
(L1/L2/L3/N/FG)