2-18 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007
Power Cable Connection Specifications
Part of the local electrical work for three-phase power feed is connecting the power
cable from the power distribution board directly to the Power Cabinet terminal
board.
Make sure that the facility administrator or a qualified electrical engineer performs
the electrical work.
FIGURE 2-7 Three-Phase Delta Power Supply Connections
Power Cabinet
FG
( Mark)
Cover
M8000: AWG8
M9000: AWG6
Remove the
cover
ACS for dual power feed
ACS for base power feed
Compression
terminal (x8)
Power cable
Bolt diameter: M8
(L1/L2/L3/FG)