Electrical Requirements
Electrical power has been connected to the top of the disconnects for each of the following:
q
NC cabinet
q
Laser power supply
q
Dust collector
q
Chiller
Preparation
q
Chiller tank has been filled with distilled water only.
(on the CKD chiller, water hoses must be connected before filling tank)
q
All plastic and paper coverings removed.
q
Clean protective coating (cosmoline) from ball screws and LM guides.
q
Each system component has been placed per the layout
q
Shop air plumbed and connected to the machine. See page 7 for details.
q
Shop air plumbed to dust collector with regulator. See page 7 for details.
I certify that each of the actions checked off above have been performed.
I understand that all of the above are needed for a successful installation and if any of the require-
ments are not met the installation will be delayed and I will be billed for one day’s service at normal
service charges, including expenses.
If the delay is to be more than one day the Engineer will be rescheduled to begin the installation on
the first available Monday after the problem has been corrected and I will be billed for the additional
travel expenses also.
Signature Title Date
ii
LC3015 Theta Pre-Install Check List (checklist page ii)