EverFocus ECOR 264-8/4 D2 DVR User Manual


 
14
Figure 1-4 Network Connection through Patch Cable
Pinout of straight patch cable
1.11 FINAL INSTALL PROCESS
Once you have completed the basic wiring connections, you are ready to turn on the DVR. Simply plug in
the power source. The POWER LED will light up if power is normal. Once the system has finished loading,
you can begin to set up the menu options for the DVR.