GSI Outdoors PNEG-1521 Satellite TV System User Manual


 
INSTALLATION
23PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger
A. Install the longest section of the ½” Clutch Control
Rod to the Clutch Control Arm on the Centerwell.
Make sure that it is contained in the square Clutch
Control Pipe Guides on the Intermediate Wells.
Bolt the Rod to the Arm with a 5/16" x 1-¾” Hex
bolt and Nylock nut.
9. CLUTCH CONTROL INSTALLATION
B. Connect the two Clutch Control Rods by threading
the ½” Internal Pipe Connector halfway onto the
Rod attached to the Centerwell. Bring the other
Clutch Control Rod up to it by running the Rod
through the Clutch Control Pipe Position Lock in
the Bin Flange, threaded end first, and making
sure that the Rod is contained by the Guides on
the Intermediate Wells. Then thread the Rod onto
the remaining threads on the Coupler.
On 36’ and 42’ diameter bins, the Clutch Control Rod will come preassembled,
and shipped inside the Unload Flight.
Centerwell
5/16” x 1-3/4”
Hex Bolt
5/16” Nylock Nut
Clutch Control Rod
Long Clutch Control Rod
Clutch Control Pipe
Position Lock
Clutch Control Arm
Clutch Control Pipe Guides
Short Clutch Control Rod
CENTER OF BIN
1/2” Internal Control Pipe Coupler
Clutch
Control Arm
FIG. 9-A
FIG. 9-B
FIG. 9-C