Hitachi AP 720STM Cable Box User Manual


 
9
2 Screen Display and Operation Method
2-5 Auto-Run (Photoreagent Setup and Process 8)
[Screen Display]
(Figure 15)
(Figure 16) (Figure 17)
[Summary]
Figure 15 will alarm Operator that Photoreagent is needed. The display shows the
elapsed time from the start of auto-pause. “Alarm Off” key will stop the alarm.
“Continue” key will shift the screen to Figure 16.
Figure 16 requests confirmation of Photoreagent setup. “No” key will return to the
previous screen. “Yes” key will shift the screen to Figure 17 and continue
Auto-Run. Please note that before pressing “Yes” key, the Operator needs to fill the
Photoreagent Reservoir with Photoreagent mixture and load into Sample/Reagent
Rack. See instructions in AP 720S Instruction Manual.
[Operation Key]
(Figure 15)
Alarm Off: Stop beep sound
Continue: To Figure 16 screen
(Figure 16)
Yes: To Figure 17 screen
No: To Figure 15 screen
(Figure 17)
Pause: To Figure 30 Pause screen