Installation 7
MAN0131 (Rev. 12/23/2005)
Sub-Frame Fit-Up
Refer to Figure 4.
1. Center sub-frame under tractor.
2. Insert cross tube of sub-frame into channel of rear
mount bracket (2).
3. Secure in place with clevis pins (6) and klik pin
(7).
4. Pivot front end of sub-frame up into front mount.
5. Secure with lock pin (4) and klik pin (5).
6. Check sub-frame fit-up, adjust as necessary.
7. Torque front mount hardware to 85 lbs-ft.
8. Remove sub-frame (1) from tractor.
1. 55038-1 Sub-frame
2. 55026 Rear mounting bracket
4. 62674 3/4 x 17.75 Lock pin
5. 62043 1/4 x 1-3/4 Klik pin
6. 1002850 .75 x 2.75 Hitch pin
7. 35124 7/16 x 2 Klik pin
Figure 4. Sub-Frame Fit-Up
Attach Sub-Frame to Backhoe
1. Align six holes on the backhoe with holes on
sub-frame.
2. Secure with cap screws (13), lock washers (14),
and hex nuts (15) as shown. Tighten according to
specifications given below.
3. Torque hardware to 297 lbs-ft.
13. 735 3/4 NC x 2 Cap screw
14. 2522 3/4 Lock washer
15. 1450 3/4 Hex nut
Figure 5. Sub-Frame to Backhoe Installation
10
11
12
7
6
5
3
4
2
1
CD5017B-2
3
17
11
19
18
16
20
10
For Mahindra
ML104 Loader Mount
14
15
13
CD5017B-3