Black Box PCW22A-R3 Cable Box User Manual


 
CHAPTER 4: Operation
23
Should the A/S-2G receive a DLE EOT (disconnect), the A/S-2G will cycle the synchro-nous DTR lead
off for 2 seconds. This action will disconnect a phone line if the DTR B jumper is set for CNT.
NOTE
The A/S-2G will cycle the synchronous DTR lead off for 2 seconds whether the DLE EOT sequence comes from
the synchronous or asynchronous side.
EBCDIC CHARACTERS STRIPPED
Character Hex Character Hex
NUL 00 ACK 2E
SOH 01 DLE 10
STX 02 NAK 3D
ETX 03 SYN 32
EOT 37 ETB 26
ENQ 2D
Table 4-4. EBCDIC characters stripped.