. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installation Instructions
72-Inch Cabinet Site Preparation and Installation Guide 15
Installation Instructions
Tools and Equipment
You will need the following tools and equipment to unpack and install a 72-inch cabinet:
•
Wrench (supplied in shipping crate) – to raise and lower the leveling glides
•
Shears – to cut the metal bands on the shipping crate
•
Forklift (optional) – to remove the cabinet from the shipping skid
•
Communication cables (optional)– additional cables to attach the cabinet to the host