LSI AA1167-E1 TV Mount User Manual


 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20 72-Inch Cabinet Site Preparation and Installation Guide
Installing the Cabinet
The installation tasks you must perform depends on how you ordered the 72-inch cabinet
and its associated modules. In most cases, you will need to do some or all of the following:
1 Check the shipping contents list to make sure all equipment arrived at the site.
2 Move the cabinet to its final location. Once it is in position, lower the levelling glides
and level the unit as necessary.
3 Install all applicable host, host adapter boards, hubs, switches, and other devices on the
network. Route the appropriate interface cables to the cabinet.
4 Route the main power cords from the cabinet to the external power source (but do not
plug in yet).
5 If necessary, install applicable mounting hardware for rackmount units. Refer to kit
instructions.
6 Install all devices in cabinet (command modules, drive modules, etc.) Refer to
applicable installation instructions for each device.
7 Route and connect appropriate interface and power cables to devices in cabinet.
8 Plug in main power cord to cabinet and turn on power. Make sure that you power-up
all devices in the proper sequence.
9 Test all devices in the cabinet and on the SCSI bus or Fibre Channel network for error
free operation.
10 Install software and configure the drive modules and controller modules as necessary.
For installation and operation information on individual modules , software, or other
network components, refer to the user manuals shipped with each unit.