24 78-8135-4385-3-A
19.8 Leaving polishing jig assembly positioned on the
lapping film rotate 180 degrees. Perform 4 additional
figure eights.
19.9 Once polishing is complete , refer to steps 17.14
through 17.17 on inspecting the connector with the
200X fiber view scope before proceeding to final step.
20.0 Finishing
20.1 If connector is not to be immediately put into service,
install the protective dust cap.
21.0 Installing Duplex Yokes
21.1 Duplex yokes may be mounted after connector has
been terminated.
21.2 With the anti-snag clip facing connector press cable
into slot on the duplex yoke and then slide the yoke up
and over the boot.