Maintenance Schedule & Procedures Teledyne API T703/T703U Calibrator Operation Manual
160
9. Perform the following procedure:
10. Tighten the two set -screws.
11. Replace the calibrator’s cover
12. Perform an auto-leak check (See Section 10.2.1).
13. Calibrate the Ozone Generator. (see Section 6.2)
07223C DCN6572