Woods Equipment MAN0063 TV Mount User Manual


 
Hydraulic Installation 21
MAN0063 (12/15/00)
#46675 Control Valve & #1001420 Hose Kit Cont’d
Connect Work Port Hoses
1. Control valve kit contains 54” hoses assembled
with quick couplers. Attach hoses to valve work
ports A, B, C, and D, following the color scheme
shown in Figure 20.
2. Identify the corresponding feedline locations
and connect opposite end of each hose to loader
feedlines as shown in Figure 20.
2
%
$
&
'
,1
287
3%<
/2$'(5 )(('/,1(6
$  %8&.(7 &</ %$6( (1'
'803  5('
%  %8&.(7 &</ 52' (1'
52//%$&.  %/8(
&  %220 &</ 52' (1'
'2:1  <(//2:
'  %220 &</ %$6( (1'
83  *5((1
$%
5+
/2$'(5
%220
&
'
Figure 19 #46675 Control Valve & Loader Feedline Connections
AB
C
D
RH
LOADER
BOOM