Ciprico 4105 Series Home Theater Server User Manual


 
MV 4105_Ciprico Inc. 5-7
MediaVault 4105 User Manual Operations
Unit Power-Up Sequence
1. Always power-up the MV 4105 before powering-up the host computer.
IMPORTANT: Wait for the MV 4105 to completely boot-up
before
powering-up the host computer.
2. If the MV 4105 needs to be re-booted:
Shut down the host computer.
Power-cycle the MV 4105.
Re-boot the host computer.
The unit power-up sequence allows the disk drive modules, and the data
access/data transmission functions of the MV 4105, to be fully operational
before the host computer is booted-up and “sees” the MV 4105 activities.
LED Power-On Sequence
The front panel LEDs of the MV 4105 power-up in the following sequence.
Depending on the size
and type of the drive, some LEDs might blink on
momen
tarily, go off, then illuminate fully after a minute or so.
TABLE 5-4. LED Power-Up Sequence.
1. Power LED.
2. RAID 3 LED (momentarily, if unit is in RAID 3 when powered-up).
3. D1 through D5 LEDs (blink momentarily before illuminating fully, depending on the size and type of drive).
4. 4 Gb LED (illuminates after host computer is powered-up).