A SERVICE OF

logo

78 SPARC Enterprise T5120 and T5220 Servers Installation Guide August 2007
4. Slide the green release tab (FIGURE C-9).
5. Push the server all the way into the the rack until it locks into place
(
FIGURE C-9).
FIGURE C-9 Sliding the Express Rail Release Tab and Securing the Server in the Rack
Caution Before continuing, verify that the server is securely mounted in the rack,
and that the slide rails are locked in the mounting brackets.