A SERVICE OF

logo

1
CHAPTER
1
Preparing for Installation
This chapter provides background information about both the servers installation
procedures that are provided in Chapter 2.
This chapter contains these topics:
“Tools and Equipment Needed” on page 3
“Optional Component Installation” on page 3
“ESD Precautions” on page 4
“Installation Overview” on page 4
“Cabling Notes for Both Servers” on page 6
“Slide Rail Assembly Notes for Both Servers” on page 10
“Cable Management Notes for Both Servers” on page 13
“Safety Precautions” on page 14
The SPARC Enterprise T5120 server is a 1 rack unit (1U) server (
FIGURE 1-1) and the
SPARC Enterprise T5220 server is a 2 rack unit (2U) server (
FIGURE 1-2).