Paradyne 9123 Flat Panel Television User Manual


 
Index
IN-9
9123-A2-GB20-10 July 2000
Spacebar, 2-6
Standard_out RIP, 1-4
standards compliance for SNMP Traps, B-6
starting
a session, 2-2
a test, 6-15
statistics, 1-7, 5-26
elements, 9-3
selecting performance intervals for display, 5-35
uploading to an NMS, 5-44
Status
Activation Certificates, 7-7
checking, scheduled activations, 7-9
checking Activation Certificate, 7-7
DLCI, 5-18
Enquiry, LMI, 3-18, 3-35
Health and, 5-14
information, 5-12
LED, 5-4
menu/branch, 2-4
PVC connection, 5-20, 5-21
test messages, 5-17
time slot assignment, 5-22
Stop Bits, 3-60
stopping a test, 6-15
Subnet Mask, 3-47, 3-57, 3-61
Node, 3-43
suggestions, user documentation, A
summary
Activation Certificate report, 7-9
network report, 9-7
switching
between screen areas, 2-8
to new software, 5-43
System
and test status messages, 5-13
configuring options, 3-16
displaying information, 5-2
entering information, 3-10
Frame Relay and LMI, options, 3-17
General options, 3-22
last rest, 5-13
messages, 2-6, 5-7
Name, Contact, and Location, 5-2
setting the clock (data & time), 3-10
T
T1
Canadian line interface cable, C-2
Canadian network cable, C-2
LMI Heartbeat, 3-19, 3-35
network cable, C-2
network interface and cable, C-2
network interface options, 3-23
T2, LMI Inbound Heartbeat, 3-19, 3-36
T3, LMI N4 Measurement Period, 3-19, 3-36
Tab key, 2-6
Tc, 3-38
TCP, 5-40
Telnet
limiting access, 4-4, 4-5
Session, 4-5
user interface options, 3-50
Terminal, Port Use, 3-59
Test
menu/branch, 2-4
Mode, 5-4
Status messages, 5-17
Tests, 1-6
aborting, 6-16
available, 6-14
Connectivity, 6-19
Data Channel Loopback, 6-25
DTE Loopback, 6-27
Duration, 3-22
IP Ping, 6-28
Lamp, 6-30
Line Loopback, 6-21
pattern, 6-26
Payload Loopback, 6-22
physical, 6-20
PVC, 6-17
PVC Loopback, 6-18
Remote Line Loopback, 6-24
Repeater Loopback, 6-23
Send/Monitor Pattern, 6-18
starting or stopping, 6-15
Timeout, 3-22, 6-15
throughput, 1-7