Surf Control 5.5 TV Receiver User Manual


 
142 Administrator’s Guide SurfControl Web Filter v5.5
S
CHEDULER
Available Events
12
AVAILABLE EVENTS
You can set up the following events in the Scheduler:
Command Line
Database Management
Database Update
Internet Threat Database Update
Network Groups Update
COMMAND LINE
Command line items such as batch routines can be scheduled to run. The following dialog box displays
when you click Configure from the Scheduler Item configuration dialog box:
Figure 12-1 Command Line Configuration dialog box
Click Browse to locate the required file. Enter any required Parameters in the Command Line Parameter
box and Click OK.
DATABASE MANAGEMENT
Choosing this option enables you to set up a scheduled event that will Archive, Purge or Compact your
database. For detailed information on setting up these events, see "Managing databases" on page 129.
You can set up a separate event for each routine, or create a combined event for the routines you want to
schedule.
To schedule Database Management events:
1Select Database Management Tasks from the Select item to configure list.
2 Set the date and time for when the database management task will occur, using the Occurs sections.
3 Enter a name for your event in the Description field.
Note: When you installed Web Filter you could choose to set up a combined Archive and Purge
scheduled event. This event is configured to run once a month. You can configure the settings
for this event by selecting it in the Scheduler and clicking Configure.