2-1
2
Installation
Introduction
This section describes the installation and setup of the Model 2200 Digital
Switcher. Installing the Model 2200 is done in the following order:
■ Unpacking
■ Installing the Control Panel
■ Installing the switcher frame in the rack
■ Option Installation
■ Cabling the equipment
■ Power connections
■ Configuring, testing and timing the installed system
Also included in this section are procedures to connect peripheral
equipment such as Grass Valley Editors, KALEIDOSCOPE, DPM-700,
Tally Control and GPI connections to the Model 2200.