Brocade Communications Systems S3-1002483-03 Home Theater Server User Manual


 
186 Brocade BigIron RX Series Hardware Installation Guide
53-1002483-03
mRJ21 procedures
D
mRJ21 procedures
The following procedure demonstrates securing up to eight mRJ21 cables into the cable cinch.
When securing fewer than the maximum cables, follow the procedure to secure the desired
number of cables and simply wrap the remaining Velcro strap around the cable cinch. Use the
additional slots in the clip to secure groups of cables as required.
Cable cinch with two mRJ21 cables
To secure two mRJ21 cables, place the Velcro strap through slot one and use the front and rear left
recesses as shown in Figure 53.
FIGURE 53 Two mRJ21 cables