Brocade Communications Systems S3-1002483-03 Home Theater Server User Manual


 
34 Brocade BigIron RX Series Hardware Installation Guide
53-1002483-03
Installing a BigIron RX-8 switch
2
Installing a BigIron RX-8 switch
This section describes the following tasks:
“Preparing the installation site”
“Unpacking a BigIron RX-8 switch”
“Chassis lifting guidelines for BigIron RX-8 switches”
“Installing the BigIron RX-8 chassis in a rack”
“Installing BigIron RX-8 modules”
“Installing power supplies in the BigIron RX-8 chassis”
“Connecting AC power to a BigIron RX-8 chassis”
“Connecting DC power to a BigIron RX-8 chassis”
“Final steps”
Preparing the installation site
Cabling infrastructure
Ensure that the proper cabling is installed in the site.
For information on cabling, refer to “Installing power supplies in the BigIron RX-8 chassis” on
page 40, “Attaching a management station” on page 54, and “Connecting a BigIron RX Series
switch” on page 71.
Installation location
Before installing the switch, plan its location and orientation relative to other devices and
equipment. For cooling purposes, allow a minimum of six inches of space between the sides, front,
and the back of the chassis and walls or other obstructions. If a chassis is installed within a
perforated enclosure, the perforations must have openings of at least 60 percent of the surface.
Unpacking a BigIron RX-8 switch
The BigIron RX-8 switch ships with several items. Review the list below, and verify the contents. If
any items are missing, contact the place of purchase:
BigIron RX-8 chassis with the appropriate number of switch fabric modules already installed in
the slot marked SF and slot blanks installed in all other module slots.
NOTE
You must provide standard #12-24 pan-head screws for mounting the BigIron RX Series chassis into
a rack.
A 115V AC power cable for each AC power supply you purchase from Brocade.
Follow the steps given below to unpack a BigIron RX-8 chassis.
1. Move the pallet to a staging area as close to the installation site as possible.
2. Position the shipping carton with the arrows pointing up.