Barco r5976832/07 Projection Television User Manual


 
7. Basic set up procedures
7.9 Install an OLite stacker system
OLite stacker
An OLite stacker is installed opposite every adjoining edge of two OLite rental columns and is required for OLite displays higher than
two OLite tiles.
Necessary tools
19 mm wrench.
Necessary parts
Eight M12 bolts per stacker foot.
How to install an OLite stacker system ?
1. Attach the stacker foot rails to the stacker foot loosely, using eight bolts.
2. Slide the stacker foot with attached rails into the slots of the beams as illustrated.
A
B
C
Image 7-17
Install stacker foot.
A Stacker foot.
B Stacker foot rail.
CM12bolt.
3. Move the stacker foot forward up against the OLite rental foot and secure the eight bolts tightly.
4. Place the stacker bridge into position and secure the bridge with a lock key and two spring cotters.
Note: The small handle to operate the side locking mechanis
m has to stand in vertical position, otherwise the handle gets in
the way to install the stacker bridg e. Pull out the small handle and turn counterclockwise until the handle stands vertical.
Image 7-18
Install stacker bridge.
48 R5976832 OLITE RENTAL DISPLAY 29/05/2007