Installation
309301G 19
Connect the Cables and Power Cord
On the bottom of the controller, there are meter and solenoid cable connectors for three Fluid
panels. The row of connectors marked
1A, 2A, and 3A are for solenoid cable connections. The
row of connectors marked
1B, 2B, and 3B are for meter cable connections. Connect the
cables as instructed below.
1. Connect the solenoid cable (E) between controller connector
1A and connector A on the
first fluid panel.
2. Connect the meter cable (F) between controller connector
1B and connector B on the first
fluid panel.
3. Repeat the cable connection for each of the fluid panels installed in the system (
2A to A,
2B to B, etc.).
A knockout, marked , is provided for a customer supplied power input (P) cable with strain
relief or for wire conduit.
FIG. 10
TI1438a
E
F
P