Operation Procedures
34 309301G
Operation Procedures
Loading Fluid Lines
Follow this procedure to load the fluid lines and purge out any air:
1. Place the dispense line [or direct the dispense valve] into a waste container.
1. To begin loading fluid, turn the Operator Station dispense switch to ON [and trigger the
dispense valve].
2. Continue dispensing until all air is purged from the fluid line and fluid flows steadily from
the valve.
3. Turn the dispense switch to AUTO to stop dispensing.
Manual Dispense
1. Place the dispense line [or direct the dispense valve] into the reservoir.
2. To begin dispensing, turn the Operator Station dispense switch to ON [and trigger the dis-
pense valve].
3. Turn the dispense switch to AUTO [or release the dispense valve trigger] to stop dispens-
ing.
Automatic Dispense
Refer to page 30 for instructions on dispensing a recipe or page 31 to dispense individual
fluids.
Wear eye protection whenever you are dispensing fluid.
Follow the additional instructions in brackets if a dispense valve is installed on the
dispense line.
STOP
DISPENSE
AUTO ON
DISPENSE
START
ti1360a
START
STOP
Dispense
Switch ON