2-74
Section 2 — Installation
System Setup
This section describes how to turn on and perform the initial setup of the
Model 2200 Switcher. It is designed to assist you in verifying proper
operation of the system, as well as allowing you to reconfigure the preset
(default) definitions of video sources and other system parameters.
System setup is divided into the following three areas:
■ Preliminary Checks — Describes the basic requirements for bringing
the system to the power-on stage. Initial checks, test/monitoring
equipment needs, and verification of proper operation are included.
■ Initial Setup — Step-by-step procedures in this section allow you to
configure the system to a particular installation.
■ System Timing—Controls on the Sync Generator allow you to move the
timing of the whole switcher—the output timing and the input timing
window—relative to the analog reference.
Preliminary Checks
Before bringing the system on-line, there are several preliminary checks
and preparations to be made.
WARNING
You should observe normal precautions when working around high current,
low voltage power supplies. Always remove rings, wrist watches, etc. before
working inside any of the systems components.
1. Verify that all cabling is clear of cooling fans and that there are no loose
tools or other metal objects near power supply buses or connections.
2. Check that all modules are seated firmly in the frame.
3. Verify that the control panel and switcher frame AC power cables are
properly connected.