2-15
Installation
15. At the left rear of the Power Supply, thread the two connectors through
the rectangular cutouts in the power supply and connect them to the
jacks that are installed in the bottom rear channel of the frame. The
connectors are keyed for proper alignment.
16. Ensure that the cables are properly positioned and reinstall the left rear
cover of the Power Supply.
Fasten Captive
Screws into
Chassis Mounting
Holes (8 Places)
at Bottom of
Signal Processor
Frame
Power Supply
Chassis
0347-02-03
Figure 2-9. Switcher Frame Power Supply Connections.