Power up the meter.
Procedure
1. Enter the Off-Line Maintenance menu and scroll to RUN KDV.
2. Set Alt to the value that is closest to the altitude of your meter, measured from sea
level.
a. Activate SCROLL to move through the list of options.
The options are 0000, 1000 feet, 2000 feet, 3000 feet, 4000 feet, 5000 feet,
6000 feet, 500 meters, 1000 meters, and 2000 meters.
b. When the correct value appears, activate SELECT and save the value to the
meter.
3. When START KDV appears, activate SELECT.
4. Wait while the meter collects and analyzes process data.
This step should be complete in approximately 20 seconds.
5. Check the results in the Results data display.
If all process variables passed the tests, no action is required. Click Close to exit
the wizard.
If one or more process variables failed the test:
- For problems with Line Temperature, verify that the ambient temperature of
the meter is stable, and that the meter temperature has stabilized in the test
location. Then retry the Known Density Verification procedure.
- For problems with Verification Time Period Signal or Drive Gain, ensure that
the meter is clean and dry. Then retry the Known Density Verification
procedure.
- If the Known Density Verification procedure continues to fail, contact
Micro Motion customer service.
9.1.2 Perform the Known Density Verification procedure using
ProLink III
The Known Density Verification procedure is used to verify that the meter's current
operation matches the factory baseline. If the meter passes the test, the meter does not
have any physical problems such as denting, bending, twisting, erosion, or corrosion.
Prerequisites
Power down the meter, remove the meter from the process, and place it in a protected
stable environment.
Minimize variation in ambient temperature.
Eliminate or minimize vibration.
Ensure that the meter is clean. Check for deposition on the tines.
Measurement support
134 Micro Motion
®